Southampton Port

Arc Commitment

The M/V Arc Commitment, part of the American Roll-On, Roll-off Carrier Fleet, called at Southampton port in 2023 and during this docking Beegrip delivered the materials she needed so that the crew could complete some spot repairs

Project specification

Sector:
Marine
Project type:
Repair
Location:
Southampton Port
Project size m2:
50
Product used:
BIMAGRIP® LS
Emery:
1–3mm
Delivered:
2023

What we delivered

Understanding the vessel schedule requires close communication with the captain of the ship, and even closer co-ordination with port ground staff. Beegrip is proud of the network we have in place to allow us to deliver, sometimes at short notice, but still in time

The repair was completed on the 5-8 and 5-3 ramps where the incumbent system had worn away. Fast cure times make small repairs like this a quick resolve for busy vessels.

775
kg

Combined product weight shipped

50
m2

Total coverage

1

Application time (hours)